Periodontal regeneration can preserve teeth with advanced attachment loss and intrabony defects, but the point at which a treated tooth is biologically and clinically ready for orthodontic movement remains insufficiently defined. Recommendations based only on elapsed postoperative time risk conflating healing chronology with periodontal stability, tissue maturation, mechanical tolerance, and interdisciplinary treatment readiness. This scoping review mapped clinical, regenerative, orthodontic, and methodological evidence relevant to determining readiness for tooth movement after regenerative periodontal surgery. A PRISMA-ScR- and JBI-compatible approach was used to identify literature published from 2017 through 2024 concerning treated periodontitis, regenerative healing, post-treatment stability, orthodontic movement, timing, and decision criteria. Sixty-eight records were identified through the executed search routes, six duplicates were removed, 13 records fell outside the predefined publication window, and 49 records underwent domain screening. Eighteen were excluded, leaving 31 evidence units for the review map. Direct evidence was concentrated in a small number of Stage IV periodontitis studies, including a randomized comparison of orthodontic initiation 4 weeks versus 6 months after regenerative surgery and longitudinal practice-based programmes using approximately 3-month sequencing. The broader literature supplied evidence on attachment gain, probing-depth reduction, pocket closure, defect morphology, inflammatory and molecular healing, radiographic changes, tooth retention, maintenance, and long-term stability, but no validated universal readiness score, biomarker cutoff, radiographic threshold, or postoperative waiting period was identified. The evidence therefore supports treating periodontal readiness as a conditional multidomain clinical state rather than a fixed chronological milestone. Clinical timing should remain contingent on periodontal control, healing trajectory, defect and patient characteristics, planned biomechanics, maintenance capacity, and interdisciplinary reassessment.